OKC FARMERS PUBLIC MARKET HISTORY

For years there had been a need for a central public market for local
farmers to sell their produce. Farmers would bring their wares into
Oklahoma City and sell them on the streets, creating congestion and
traffic problems. The Market came about as a result of this long
standing conflict between local farmers and the downtown business
community. The Oklahoma City Farmers Public Market first opened
its doors on June 16, 1928 on the site of the Delmar Gardens
Amusement Park. John J. Harden built the two-story, 40,000 square
foot structure at a cost of $500,000. The downstairs was mainly used
by farmers who sold fresh produce. Upstairs there were concerts,
dances, boxing matches and roller-skating.
Hank Williams Sr., Count Bassie, and Bob Wills have all played in the Auditorium. In its heyday, the building also housed a grocery store, meat market, candy store, bakery, café, and drug store.
The main building was placed on the national register of historic places in 1982. It is the second largest building in Oklahoma City on the national register.
The "fan or mall" is a twenty thousand square foot building that once wrapped around three sides of the main structure. It was divided into 9 x 18 foot stalls in order for farmers to pull their trucks or wagons in to set up shop for the day. Today this buildingis filled with an eclectic mix of shops offering anything from collectables to fresh cut flowers.
After years of neglect, Burt and Jody McAnally purchased the six-acre property in July of 2002 from John E. Harden, grandson of the original owner. Their vision is to restore the "Market " to its former glory.
OKC FARMERS PUBLIC MARKET RESTORATION
Restoration began in August of 2002 and will feature a redeveloped ground floor market with numerous specialty vendors, including the market, florist, bakery, and restaurant. The second floor space will be redeveloped into a grand space for special events such as boxing, musical performances, dances, and receptions. The second floor will continue to have the largest hardwood floor in the State, and will have improvements such as elevators, new expanded restrooms, and mechanical and electrical systems. Restoration should be completed within 4 years at an estimated cost of $4 million.
You can download a pdf file of interior renderings by clicking here
Artist’s renditions of future restoration (roll over thumbnails for a larger view):